COMPONENTS
FUSE
TEST PROCEDURE
Check for continuity of the fuse with an multi-meter.
RESULTS
Normal Abnormal
NOTE: If the fuse is blown, check the primary, the secondary, and the monitor switches, H.V.D. and H.V.C. before replacing the fuse. If the fuse is blown by improper switch operation replace the defective switch and the fuse at the same time. Replace just the fuse if the switches operate normally. HEATER ELEMENT (Wire leads removed.) Measure the resistance. (Multi-meter scale: Rx1) Normal: *Grill heater Approx. 50 � (at 20 ~ 30°C)
Measure the resistance with 500V-100M ohm insulation resistance meter. Normal: more than 200 M�
NOTE: Make sure heater is fully cooled when tested. GRILL THERMOSTAT 0°C~Approx.90°C Approx.90°C